AZURE / AWS MIGRATIONS
How Haven Blueshore moves client workloads to Azure and AWS — the landing-zone pattern, the migration runbook, and how capability is measured.
Status labels
Every section on this page carries one label. Live — running in production today. Standard — the delivery standard we build to. Target — an alternative approach, defined here for engagements that call for it.
Delivery standard Standard
This page documents the delivery standard — how Haven migrates client workloads.
Landing-zone reference architecture Standard
No workload moves before the landing zone exists. The landing zone is the same on Azure and AWS: one identity plane, one network layout, one logging destination, and one cost control. Identity is named roles only — no shared logins, no standing broad access. The network is segmented so a migrated workload cannot reach what it was never meant to touch. Every resource logs to one place, and every resource is tagged with its owner and its workload, so a cost report names who spent what on which system.
Migration runs in waves, not all at once. Each wave is one workload or one small group of workloads that depend on each other. A wave is assessed first — what it reads, what it writes, who depends on it — then replicated, then cut over in an agreed window with a named rollback. A wave is not done when the workload runs in the cloud. It is done when the old copy is retired, the new copy is monitored, and the client has confirmed the workload works.
Security hardening is part of the landing zone, not a step after migration. A workload that lands without the hardening baseline is not a migrated workload — it is a risk that moved.
Migration patterns Standard
| Pattern | Fits when | Haven standard use |
|---|---|---|
| Rehost | The workload runs as-is and the goal is to move it, not change it | Lift-and-shift to a cloud VM or container host; the fastest wave, and the default unless a reason to change the workload exists |
| Replatform | The workload benefits from a managed service without a rewrite | Move to a managed database or managed runtime where the client's team can support it; the application itself stays the same |
| Refactor | The workload needs a redesign to use the cloud well | A separate project with its own scope and acceptance criteria — never folded silently into a migration wave |
The pattern is chosen per workload, not per client — one engagement can rehost most workloads and replatform the one that benefits from it. The choice is recorded in the wave plan with its reason, so the client can see why each workload moved the way it did.
Architecture decision records Standard
- ADR-001 — Landing zone first, workloads second. Context: a workload migrated into an ungoverned cloud account inherits every risk that account has. Decision: identity, network, logging, and cost controls exist before the first wave moves. Consequences: the first wave is slower than a lift-and-shift with no landing zone; every later wave is faster and safer because the guardrails already exist.
- ADR-002 — One primary cloud per client. Context: clients arrive with different existing footprints, licensing, and team skills, and the marketed offer covers Azure and AWS. Decision: choose the primary cloud per client on existing footprint, licensing, and team skill; a multi-cloud strategy means the client's workloads have one primary home, with a second cloud used only where a named workload requires it. Consequences: one platform to learn, secure, and pay for per client; a workload is never split across clouds without a written reason.
These records state the adopted standard as of 2026-11-18. A decision changes only by a new ADR that names what it supersedes.
User requirements outline Standard
The URS for a client migration is written per engagement. The outline below is the starting set — every requirement is verified by a named test before the migration is accepted.
- URS-MIG-01 — The cutover window is agreed, not assumed. Each wave names its cutover window and its acceptable downtime before migration begins. A workload with no agreed window does not migrate.
- URS-MIG-02 — Rollback is real. Every wave has a tested rollback to the pre-migration state. A wave with no rollback plan does not cut over.
- URS-MIG-03 — Nothing is lost in the move. Data is reconciled after migration: what was there before is there after, or the difference is named and explained.
- URS-MIG-04 — Hardening travels with the workload. The security baseline is applied in the landing zone before cutover, and verified after it.
- URS-MIG-05 — Cost is known before it is spent. Each wave carries a cost estimate for the migrated workload, and actual spend is reviewed against it after cutover.
- URS-MIG-06 — The old copy is retired. A wave is not complete until the source workload is decommissioned or its continued running is named and justified. A forgotten source is a security and cost risk.
BPA benchmark track Standard
Delivery capability is measured, not asserted. The benchmark track covers three documents per engagement: a functional record (what was migrated, against the URS), an architectural record (landing zone, platform choice, wave plan — against the ADRs above), and a governance record (who can change the cloud environment, how a change is reviewed, how a failure is handled).
Capability is re-evaluated yearly against the same measures: cutover duration against plan, cost against estimate, and post-migration incidents per wave. The baseline is taken on each engagement delivered to this standard, and every yearly re-evaluation is recorded against it.
Guardrails
- No workload moves before the landing zone exists.
- No wave cuts over without a tested rollback.
- Benchmark, cost, and downtime figures are measured per engagement and recorded against the yearly baseline.
- Sections are labeled Live, Standard, or Target.