● INDUSTRIAL IIOT ●

INDUSTRIAL IIOT & SCADA INTEGRATION

How Haven Blueshore bridges OT and IT for industrial clients — the reference architecture, the predictive-maintenance approach, and the GAMP validation pack.

← Back to Technical Portal

Status labels

Every section on this page carries one label. Live — running in production today. Standard — the delivery standard we build to. Target — an alternative approach, defined here for engagements that call for it.

Delivery standard Standard

This page documents the delivery standard — how Haven integrates industrial systems for clients. The connectivity half is documented separately on the NMEA 2000 & Backhaul page (vessel telemetry, fiber primary, cellular secondary, Starlink as the alternative leg). Failure-signal thresholds, sensor lists, and model inputs are defined per engagement.

OT/IT reference architecture Standard

Every industrial engagement follows the same shape. Field devices — PLCs, SCADA controllers, sensors — live on a control network that has no direct path to the internet. Data crosses from OT to IT through a defined boundary: a historian collects readings from the control network, and everything above the boundary — dashboards, alerts, models — reads from the historian, never from the control network directly. The backhaul from the site follows the same pattern as the NMEA page: fiber where it exists, cellular as secondary, satellite as a labeled Target.

Protocols are translated at the boundary, not at the device. Modbus TCP and OPC UA are the standard integration protocols; device-specific protocols are translated by a gateway into one of them, so the historian and the models see one shape of data regardless of which vendor's hardware is on the floor. A sensor that cannot be read through the gateway is not part of the system until it can be.

An integration is not done when the first reading lands in the historian. It is done when a lost sensor or a dead gateway pages someone, when a reading can be traced from the historian back to the device that produced it, and when the client can say what happens if the link to the site goes down — because it will, eventually.

Design patterns Standard

PatternFits whenHaven standard use
SCADA IntegrationAn existing SCADA system must feed IT systems without disturbing controlRead-only integration through the historian; the control network is never written to from IT
Predictive MaintenanceEquipment failure has a measurable cost and a detectable warning signModels train on historian data and produce alerts for humans; a model never drives a control action on its own
Industrial SecurityOT and IT share a site and a network boundarySegmented control network, one defined data boundary, named access to the historian; no direct OT-to-internet path

Predictive-maintenance models are trained on historian data, never on live control data, and their outputs go to people, not to actuators. Whether a model output ever drives a control action is a validation decision, made per engagement through the GAMP pack below — never a default.

Architecture decision records Standard

  • ADR-001 — OT and IT are segmented, with one defined data boundary. Context: a control network that can be reached from IT can be reached from anywhere IT can be reached from. Decision: the control network is segmented with no direct path to the internet; data crosses only through the historian boundary. Consequences: integration work is slower than a flat network; a compromised IT system cannot reach a PLC.
  • ADR-002 — Analytics reads a copy; nothing writes back to control without a validated path. Context: models and dashboards are useful, but a bad write to a controller is a safety event. Decision: all analytics read from the historian; any path that writes to control must go through the GAMP validation pack and a named human approval. Consequences: predictive maintenance starts as alerts for people, not automation; automation of a control action is a separate, validated decision.

These records state the adopted standard as of 2026-11-18. A decision changes only by a new ADR that names what it supersedes.

User requirements outline Standard

The URS for a client IIoT engagement is written per engagement. The outline below is the starting set — every requirement is verified by a named test before the integration is accepted.

  • URS-IIOT-01 — Every reading is accounted for. Each sensor and PLC source is listed by name; a reading that stops arriving is a failure, not a gap in the chart.
  • URS-IIOT-02 — Control is isolated. No path from IT or the internet reaches a controller. The boundary is tested, not assumed.
  • URS-IIOT-03 — A reading is traceable. Any value in the historian can be traced back to the device and the time that produced it.
  • URS-IIOT-04 — Failure pages someone. A lost sensor, a dead gateway, or a broken link alerts the on-call route. Silence is treated as a failure.
  • URS-IIOT-05 — Models advise, they do not command. Predictive-maintenance output goes to a person. A model output drives a control action only after validation and named human approval.
  • URS-IIOT-06 — History is retained. Historian retention is named per engagement, and the data needed for a future investigation is there when it is needed.

GAMP validation pack Standard

For regulated clients, the integration is delivered with a validation pack. The pack below is the structure and the templates — the outlines a validation follows. Each item is filled in per engagement, and the completed pack is the acceptance record.

  • FMEA outline. For each component — sensor, gateway, historian, network link, model — list the failure modes, what each failure does to the system, how it is detected, and what mitigates it. Failure-signal thresholds are defined per engagement.
  • FAT outline (factory acceptance test). The integrated system is tested on the bench before it ships to site: every interface exercised, every failure mode from the FMEA that can be simulated is simulated, and the results are recorded against the URS.
  • SAT outline (site acceptance test). The installed system is tested at the client site: readings verified against the field devices, the boundary tested, failover of the link exercised, and the results recorded against the URS.
  • IQ outline (installation qualification). The installed configuration is verified against its design: devices, versions, network layout, and access controls are recorded as installed — not as intended.
  • OQ outline (operational qualification). The system is exercised through its operating range: normal readings, boundary conditions, and failure conditions, each checked against the URS.
  • PQ outline (performance qualification). The system is run under real operating conditions for an agreed period and its performance is measured against the URS — data completeness, alert behavior, and model outputs.
  • Test-script outline. Numbered test cases, each linked to one URS requirement, each with a defined input, an expected result, and a pass/fail record. A URS requirement with no test case is an untested requirement.
  • Work-instruction outline. Step-by-step instructions for operating the system: starting and stopping the historian feed, responding to a sensor or gateway failure, and escalating a control-network event. Written for the operator, not the engineer.
  • QA audit outline. What the auditor checks: the URS against the delivered system, the FMEA against the failure modes seen in operation, the test scripts against their records, and the work instructions against what operators actually do. Findings are recorded and tracked to closure.

BPA benchmark track Standard

Delivery capability is measured, not asserted. The benchmark track covers three documents per engagement: a functional record (what the integration does, against the URS), an architectural record (OT/IT layout, boundary design, protocol choices — against the ADRs above), and a governance record (who can change the integration, how a change is reviewed, how a failure is handled).

Capability is re-evaluated yearly against the same measures: data completeness from field to historian, alert accuracy for sensor and gateway failures, and maintenance outcomes from predictive alerts. The baseline is taken on each engagement delivered to this standard, and every yearly re-evaluation is recorded against it.

Edge-Compute Node Standard

$140/mo. On-site compute with telemetry caching, managed monthly — your local systems keep running even when the internet doesn't.

On-site compute at the edge caches telemetry locally, so the plant keeps running and its data is not lost when connectivity drops.

Grid-Guard Load Balancing Standard

$5,000. Dynamic power throttling for EV charging clusters — add chargers without overloading your building's electrical service.

Power is throttled dynamically across the charging cluster, so new chargers can be added without an electrical-service upgrade.

Guardrails

  • No path from IT or the internet reaches a controller — the boundary is tested, not assumed.
  • No model output drives a control action without validation and named human approval.
  • Validation claims are recorded against the completed pack.
  • Benchmark, accuracy, and outcome figures are measured per engagement and recorded against the yearly baseline.
  • Sections are labeled Live, Standard, or Target.