● BILL OF MATERIALS ●

TACTICAL HARDWARE MANIFEST

Standardized Component List for Managed Marine EV Charging Infrastructure

← Back to Technical Portal

Equipment Overview

The following components constitute the standardized deployment manifest for Haven Blueshore managed marine EV charging infrastructure. Each component has been selected for operational reliability, security posture, and managed-service deployment standards. This BOM serves as the definitive reference for procurement, installation, and validation teams.

Core Hardware Bill of Materials

ComponentRoleSpecificationCompliance
Security GatewayFirewall / SD-WAN
Sophos XGS 126
Edge Threat Protection, DPI, Zero Trust
✓ SURVEY-READY
Wireless Access PointRuggedized Outdoor
Cisco Meraki MR Series
IP67 Rating, Cloud-Managed, PoE++
✓ SURVEY-READY
IoT GatewayTelemetry Bridge
NMEA 2000 to Ethernet Bridge
Vessel-to-Cloud Conversion, Encrypted Uplink
✓ SURVEY-READY
Compute NodeLocal MLOps
Industrial Edge Node
Fanless, -20°C to +60°C, ML Inference
✓ SURVEY-READY

Component Deep Dive

Sophos XGS 126

  • Throughput: 12 Gbps
  • DPI Engines: 5
  • PoE Ports: 4x GE + 1x SFP
  • IPS/IDS Signatures: 50K+
  • Compliance: PCI-DSS, IEC 62443

Cisco Meraki MR Series

  • Form Factor: Outdoor Weatherproof
  • Coverage: 100m+ radius
  • PoE Input: 802.3bt
  • Bands: Dual 5 GHz + 2.4 GHz
  • Compliance: IP67, NEMA 4X

NMEA 2000 Gateway

  • Protocol: ISO 11783 (NMEA 2000)
  • Outputs: Ethernet RJ45 + USB
  • Encryption: TLS 1.3
  • Latency: < 50ms
  • Compliance: IEC 61162-1, -2, -3

Industrial Edge Node

  • CPU: Quad-core ARM Cortex-A72
  • RAM: 8GB LPDDR4
  • Storage: 64GB eMMC + 256GB SSD
  • Temp Range: -20°C to +60°C
  • OS: Linux Kernel 5.10+
Deployment Validation: All components are validated against the Haven Blueshore deployment standard. Each facility passes a three-stage validation before deployment: (1) Hardware Inventory Check, (2) Network Connectivity Test, (3) Site Survey Review.

Procurement & Lead Times

Typical Procurement Timeline (from order to delivery):

  • Sophos XGS 126: 2-4 weeks
  • Cisco Meraki MR Series: 3-5 weeks
  • NMEA Gateway: 1-2 weeks
  • Industrial Edge Node: 2-3 weeks

Contact your Tactical Lead to request a site survey and discuss procurement options.

Support & Questions

For BOM customization, alternative component suggestions, or procurement assistance, contact our technical team:

Email: procurement@havenblueshore.tech