● BILL OF MATERIALS ●
TACTICAL HARDWARE MANIFEST
Standardized Component List for Managed Marine EV Charging Infrastructure
Equipment Overview
The following components constitute the standardized deployment manifest for Haven Blueshore managed marine EV charging infrastructure. Each component has been selected for operational reliability, security posture, and managed-service deployment standards. This BOM serves as the definitive reference for procurement, installation, and validation teams.
Core Hardware Bill of Materials
| Component | Role | Specification | Compliance |
|---|---|---|---|
| Security Gateway | Firewall / SD-WAN | Sophos XGS 126 Edge Threat Protection, DPI, Zero Trust | ✓ SURVEY-READY |
| Wireless Access Point | Ruggedized Outdoor | Cisco Meraki MR Series IP67 Rating, Cloud-Managed, PoE++ | ✓ SURVEY-READY |
| IoT Gateway | Telemetry Bridge | NMEA 2000 to Ethernet Bridge Vessel-to-Cloud Conversion, Encrypted Uplink | ✓ SURVEY-READY |
| Compute Node | Local MLOps | Industrial Edge Node Fanless, -20°C to +60°C, ML Inference | ✓ SURVEY-READY |
Component Deep Dive
Sophos XGS 126
- Throughput: 12 Gbps
- DPI Engines: 5
- PoE Ports: 4x GE + 1x SFP
- IPS/IDS Signatures: 50K+
- Compliance: PCI-DSS, IEC 62443
Cisco Meraki MR Series
- Form Factor: Outdoor Weatherproof
- Coverage: 100m+ radius
- PoE Input: 802.3bt
- Bands: Dual 5 GHz + 2.4 GHz
- Compliance: IP67, NEMA 4X
NMEA 2000 Gateway
- Protocol: ISO 11783 (NMEA 2000)
- Outputs: Ethernet RJ45 + USB
- Encryption: TLS 1.3
- Latency: < 50ms
- Compliance: IEC 61162-1, -2, -3
Industrial Edge Node
- CPU: Quad-core ARM Cortex-A72
- RAM: 8GB LPDDR4
- Storage: 64GB eMMC + 256GB SSD
- Temp Range: -20°C to +60°C
- OS: Linux Kernel 5.10+
Deployment Validation: All components are validated against the Haven Blueshore deployment standard. Each facility passes a three-stage validation before deployment: (1) Hardware Inventory Check, (2) Network Connectivity Test, (3) Site Survey Review.
Procurement & Lead Times
Typical Procurement Timeline (from order to delivery):
- Sophos XGS 126: 2-4 weeks
- Cisco Meraki MR Series: 3-5 weeks
- NMEA Gateway: 1-2 weeks
- Industrial Edge Node: 2-3 weeks
Contact your Tactical Lead to request a site survey and discuss procurement options.
Support & Questions
For BOM customization, alternative component suggestions, or procurement assistance, contact our technical team:
Email: procurement@havenblueshore.tech